沪苏锡常城际铁路太仓先导段首台盾构机“苏铁先锋号”顺利始发
Jiang Nan Shi Bao·2025-11-21 12:43

Core Points - The commencement of the shield tunneling for the Taicang pilot section of the Huzhou-Suzhou-Xuzhou-Changzhou intercity railway marks a significant milestone in the project [1] - The Huzhou-Suzhou-Xuzhou-Changzhou intercity railway serves as a crucial transportation link between Shanghai and Suzhou, with the pilot section covering a length of 4.8 kilometers and facing complex geological conditions [2] - The project is part of a broader multi-level rail transit planning initiative in the Yangtze River Delta, with the pilot section designed for a speed of 160 km/h and a total length of 10.24 kilometers [3] Group 1 - The shield machine "Sutiexianfenghao" has begun its operation, indicating the start of the critical tunneling phase for the railway project [1] - The construction area involves challenging geological conditions, requiring high precision and safety measures due to the need to cross seven rivers and various structures [2] - The project integrates advanced technologies such as personnel positioning, AI monitoring, and automated measurement systems to enhance construction efficiency and safety [2] Group 2 - The pilot section will connect with multiple urban rail transit lines in Shanghai, facilitating better integration of Taicang into the regional transportation network [3] - The project includes three stations, with two underground and one elevated, and is expected to be completed within four years [3] - The initiative aims to strengthen collaboration between Shanghai and Suzhou, providing essential infrastructure support for regional integration in the Yangtze River Delta [3]

沪苏锡常城际铁路太仓先导段首台盾构机“苏铁先锋号”顺利始发 - Reportify