Core Insights - Lingbao Gold (03330) announced the completion of exploration work in the Tongbai Laowan gold mining area, with the first resource report compliant with JORC standards, indicating significant mineral resources [1][2] Group 1: Mineral Resource Estimates - As of September 30, 2025, the estimated gold metal content in the Tongbai Laowan gold mining area is 175.3 thousand ounces (54.51 tons), representing an increase of 73.7 thousand ounces (22.94 tons) or 73% compared to the previous estimate of 101.5 thousand ounces (31.57 tons) as of December 31, 2024 [2] - The total estimated mineral resources include: - "Proven" ore of 640 thousand tons with a grade of 4.18 grams per ton, yielding 86 thousand ounces (2.67 tons) of gold - "Controlled" ore of 4,400 thousand tons with a grade of 4.85 grams per ton, yielding 687 thousand ounces (21.36 tons) of gold - "Inferred" ore of 7,690 thousand tons with a grade of 3.96 grams per ton, yielding 980 thousand ounces (30.48 tons) of gold - Total ore of 12,730 thousand tons with a grade of 4.28 grams per ton, yielding 1,753 thousand ounces (54.51 tons) of gold [1][2] Group 2: Future Exploration Plans - The mining rights below -350 meters remain open for further exploration, with the deepest drill hole encountering mineralization at -1,284 meters, indicating ongoing potential for additional resources [2] - The company is advancing plans for the next phase of drilling [2][3]
灵宝黄金(03330):桐柏老湾金矿区完成全区勘探工作 金金属量(矿产资源量)增长约73%至54.51吨