Core Insights - The customized wind turbine platform designed for high altitude and low wind speed environments has officially been launched in Guizhou Province, marking the production commencement of Shanghai Electric Wind Power Group (Guizhou) Co., Ltd [1] - The new wind turbine model EW6.25-220 is optimized for operations above 2000 meters and with an annual equivalent operating hour of approximately 1700 hours, achieving a utilization rate of over 98.5% [1] - The production base aims to establish a complete supply chain for clean energy equipment in the Southwest region, with a projected annual output value of approximately 1.5 billion yuan upon reaching full capacity [1] Company Developments - The wind turbine production facility is located in the Shanghai Electric Guizhou Longli Industrial Park, with plans for a blade factory to commence operations in 2024 [1] - The launch of the wind turbine signifies a significant step towards creating a comprehensive ecosystem for the clean energy industry, covering materials, core components, complete machines, and operational services [1] Industry Trends - During the 14th Five-Year Plan period, Guizhou has added a total of 3.44 million kilowatts of wind power capacity, representing a 62.5% increase compared to the end of 2020 [2] - There are currently 8.52 million kilowatts of wind power projects under construction, with expectations to exceed 10 million kilowatts by the end of 2025 [2] - The new wind turbine technology is anticipated to further expand wind power application scenarios during the 15th Five-Year Plan period [2]
适配高海拔、低风速环境的新型风电主机在贵州下线
Xin Hua Wang·2025-11-26 13:26