Core Insights - The first zero-carbon park project in Heilongjiang has been established in Hegang, with a total investment of 5.6 billion yuan, marking a significant step towards creating a vibrant green low-carbon industrial ecosystem in the region [1][4] Group 1: Zero-Carbon Park Project - The zero-carbon park project has a total investment of 5 billion yuan and aims to develop a 500MW wind power project along with supporting facilities, providing stable green electricity at a cost not exceeding 0.5 yuan per kilowatt-hour [1][3] - The project will significantly reduce energy costs for enterprises and attract high-energy-consuming companies, including a green methanol project with an annual production capacity of 125,000 tons [1][2] Group 2: Wind Blade Production Base - The wind blade production base, with a planned investment of 600 million yuan, will be located in the Hegang High-tech Industrial Park and is expected to start construction in 2026, with completion in 2027 [2] - The base will feature four production lines for 120m wind blades, achieving an annual production capacity of 200 sets (600 blades) and an estimated annual output value of 600 million yuan [2] Group 3: Strategic Importance and Synergy - The zero-carbon park and wind blade production base are interdependent, creating a complete closed loop from equipment to power generation and consumption, driving profound changes in Hegang's energy structure and industrial form [4] - The collaboration between Hegang and Yunda Energy Technology Group represents a shift from resource dependence to innovation-driven development, establishing a new paradigm for green development [4]
“以绿制绿”打造“零碳样板” 鹤岗56亿开篇“十五五”
Di Yi Cai Jing·2025-11-29 02:33