Core Viewpoint - The Shandong Yellow River Administration has announced the official start of the 2025-2026 ice flood period for the Shandong section of the Yellow River on December 1, emphasizing the need for comprehensive flood prevention measures due to significant temperature fluctuations expected this winter [1] Group 1: Flood Prevention Measures - The Shandong Yellow River Administration is conducting special inspections for flood prevention hazards related to six under-construction cross-river bridges and 50 floating bridges that may affect flood safety [1] - Emergency measures are being developed in collaboration with relevant units to ensure adequate personnel and material support for flood prevention [1] - The administration is enhancing technological capabilities to improve monitoring accuracy, including the optimization of the ice monitoring intelligent analysis system [1] Group 2: Monitoring and Reporting Systems - The use of drones and video surveillance is being integrated into the monitoring system, creating a comprehensive "sky, ground, and human" ice monitoring perception system [1] - Continuous improvements are being made to the reporting system for ice conditions and hazards to increase reporting efficiency [1]
黄河山东段即将进入凌汛期 防凌准备工作开启
Yang Shi Xin Wen·2025-11-29 07:42