中国神华(01088):北海二期3号机组通过168小时试运行并移交商业运营
智通财经网·2025-11-30 12:02

Core Viewpoint - China Shenhua (01088) announced that its subsidiary, Guoneng Guangtou Beihai Power Co., Ltd., successfully completed the trial operation of Unit 3 of the Beihai Phase II expansion project, marking its transition to commercial operation [1] Group 1: Project Details - The Beihai Phase II project is located in the Tieshan Port area of Beihai City, Guangxi Zhuang Autonomous Region, and involves the construction of two 1 million kilowatt ultra-supercritical reheating coal-fired power generation units [1] - The project is a key initiative in the energy development "14th Five-Year Plan" of Guangxi Zhuang Autonomous Region, utilizing advanced technologies such as ultra-clean coal power generation, deep peak regulation, and flexible operation [1] - The design coal consumption for power supply is 266.86g/kWh, with zero emissions for wastewater and solid waste, and ultra-low emissions for air pollutants [1] Group 2: Future Developments - Construction of Unit 4 of the Beihai Phase II project is progressing steadily, with plans for it to be operational by December 2025 [1] - Once fully operational, the Beihai Phase II project will optimize the regional power supply structure, enhance the safety and stability of the power grid, and effectively meet the long-term load growth demands of the region [1] - The project will provide significant support for the construction of the new western land-sea corridor and the socio-economic development of the region [1]

CSEC,China Shenhua-中国神华(01088):北海二期3号机组通过168小时试运行并移交商业运营 - Reportify