福德士河与比亚迪携手打造250MWh储能系统
Core Viewpoint - Fudeshih River has successfully delivered its first large-scale Battery Energy Storage System (BESS) in the Pilbara region, utilizing BYD's blade battery technology to store renewable energy generated during the day and provide green power to the energy transmission network at night [1] Group 1: Project Details - The BESS is located at North Star Junction and consists of 48 storage containers [1] - The total capacity of the storage system is 250 MWh, capable of providing continuous power at 50 MW for up to 5 hours [1]