Q2 Metals Reports Multiple Wide, Mineralized Intercepts from Infill Drilling at the Cisco Lithium Project, Including 95.1 m and 81.9 m each Grading 1.56% Li₂O
Highlights: Four (4) drill holes from the 2025 infill drill program with strong analytical results are reported herein: CS25-040: 12 separate intervals, including 95.1 metres (“m”) at 1.56% Li2O, 81.9 m at 1.56% Li2O and 66.5 m at 1.26% Li2O;CS25-041: seven (7) separate intervals, including 53 .9 m at 1.53% Li2O, 54.0 m at 1.21% Li2O and 41.2 m at 1.31% Li2O;CS25-042: 16 separate intervals, including 32.7 m at 1.56% Li2O, 26.5 m at 1.53% Li2O, 26.3 m at 1.47% Li2O, 32.1 m at 1.14% Li2O, and 26.1 m at 1.13% ...