Canuc Drills 5 m of 10.02 g/t Au Near Surface in Gold Lens 1
Newsfile·2025-12-01 14:00

Core Insights - Canuc Resources Corporation has announced positive results from its diamond core drilling program at Gold Lens 1, part of the East Sudbury Project, indicating high-grade gold mineralization [1][5]. Group 1: Drilling Results - The first three drill holes have been completed, with the third hole intersecting the main zone from 14.5 to 24.5 meters, assaying 5.11 g/t Au over a 10-meter interval, including a lower 5-meter section that assayed 10.02 g/t Au [5]. - A notable 1-meter interval within this lower section assayed 40.9 g/t Au, suggesting significant gold presence in the area [5]. - The drilling program aims to define the boundaries of Gold Lens 1 and assess the continuity of mineralization, with the zone identified over a strike length of 80 meters and widths ranging from 3 to 5 meters [3][4]. Group 2: Project Background - Gold Lens 1 is located adjacent to the historical North Pit Gold Mine, which has a history of gold production, and is estimated to have around 147 historical drill holes [2]. - The East Sudbury Project spans 19,710 hectares and is situated approximately 20 kilometers northeast of the Sudbury Mining Camp, an area known for its mineral wealth [11]. Group 3: Future Plans - The company plans to calculate a maiden resource for Gold Lens 1, which could lead to evaluating extractive opportunities in the area [9]. - There is an expectation of discovering additional gold lenses across the property, enhancing the potential for significant mineral endowment [9].

Canuc Drills 5 m of 10.02 g/t Au Near Surface in Gold Lens 1 - Reportify