Core Insights - Torex Gold Resources Inc. reported promising drill results from the 2025 drilling program at Media Luna West, supporting the declaration of an inaugural Inferred Resource in March 2026 [1][2][15] Drilling Results - The drilling program defined a mineralized footprint of 400 x 300 meters, with high-grade results including 12.25 grams per tonne gold equivalent (gpt AuEq) over 11.0 meters in drill hole ML25-1088D and 17.79 gpt AuEq over 12.9 meters in ML25-1095D [2][14] - A total of 10,744 meters of drilling was conducted across 23 drill holes in 2025, with an additional drill hole from 2024, totaling 11,303 meters over 24 drill holes [7][16] Future Plans - Future drilling will focus on expanding the resource footprint towards the north and south, particularly towards the San Miguel fault, and upgrading resources from Inferred to Indicated category [2][15] - The company anticipates sharing results from other targets across the Media Luna Cluster and Atzcala in the coming months, showcasing the exploration potential at Morelos [4][5] Geological Insights - The exploration at Media Luna West is guided by a deeper understanding of structural controls, focusing on the intersection of north-south structural corridors with west-northwest-striking faults linked to the San Miguel fault [6][19] - The mineralization is characterized by a sequence that began with copper-rich mineralization, followed by gold-rich fluids that preferentially mineralized the fringes of breccias [13][22] Strategic Objectives - Torex aims to enhance and extend the production profile of the Morelos Complex by expanding resources and increasing reserves, with a target of sustaining production above 450,000 gold equivalent ounces well beyond 2030 [4][29] - The company is committed to responsible mining and seeks to optimize production and costs while pursuing disciplined growth and capital allocation [30][28]
Torex Gold Reports Promising Drill Results from Media Luna West