江苏沿海能源新动脉年底贯通,设计年输送天然气能力达280亿立方米

Core Insights - The Jiangsu Coastal Natural Gas Pipeline, with an annual transmission capacity of 28 billion cubic meters, is set to be fully operational by the end of this year, significantly enhancing the energy infrastructure in the Yangtze River Delta region [1][2] Group 1: Pipeline Development - The pipeline's construction has reached over 500 kilometers, with a total operational length expected to exceed 1,000 kilometers by year-end, bolstering natural gas supply security in Jiangsu province [2] - The successful commissioning of the Huai'an-Jianhu-Yancheng section, which is 150 kilometers long, connects key gas storage facilities and enhances the integration with the national pipeline network [1][2] Group 2: Strategic Partnerships and Infrastructure - A cooperation agreement between Guoxin Group and the National Pipeline Group aims to deepen the integration of provincial and national gas networks through a "three-network" model [1] - The Guoxin LNG receiving station project, with an investment of approximately 7.7 billion yuan, is under construction and will be the first large-scale storage and peak-shaving project independently built by Jiangsu [2] Group 3: Future Prospects - Guoxin Group is expanding its natural gas supply chain by investing in upstream projects and aims to create a comprehensive energy system that includes wind, solar, water, fire, gas, and storage [2] - The anticipated natural gas supply capacity is expected to account for about 15% of Jiangsu's energy supply, comparable to the electricity supply capacity [2]