Core Viewpoint - The expansion of the Musaken wastewater treatment plant in Sousse, Tunisia, is crucial to meet the growing urban demand for wastewater management, with the current facility unable to handle the daily sewage output of 13,000 tons from approximately 200,000 residents [2]. Group 1: Project Overview - The Musaken wastewater treatment plant currently has a daily treatment capacity of 6,000 tons, which will be increased to 17,000 tons upon completion of the expansion [1]. - The project is being managed by China Electric Power Construction Group's Water and Hydropower Fifteenth Bureau, with the main construction expected to be completed by March next year [2]. Group 2: Environmental Impact - The existing wastewater treatment facility has been insufficient, leading to untreated sewage being discharged directly into local rivers, causing significant environmental damage [2]. - The successful operation of the Sousse wastewater treatment plant, which processes 53,000 cubic meters of wastewater daily, has resulted in a 40% reduction in irrigation costs for local agriculture and improved water quality in the Sousse River [2]. Group 3: Technological and Local Development - The project includes upgrades such as replacing surface aerators with bottom air diffusion plates to enhance oxygen levels in wastewater and improving sludge treatment lines for better efficiency [4]. - The project emphasizes local talent development, with an 81% localization rate and ongoing training for local employees, including multilingual safety and cultural communication courses [4]. Group 4: Stakeholder Perspectives - Local authorities, including the head of the Sousse Health Bureau, express a strong desire for the timely completion of the wastewater treatment plant to meet community expectations [7].
“希望污水厂尽早完工”