视频丨进度条刷新 塔里木盆地最大储气库地面扩建工程完工
Yang Shi Xin Wen·2025-12-03 07:16

Core Insights - The Tarim Basin's largest gas storage facility, the Yaha Gas Storage, has completed its surface expansion project, increasing its daily gas injection capacity by 10 million cubic meters [1] - The Yaha Gas Storage is built on the Yaha condensate gas field, with an average burial depth exceeding 5,100 meters, making it the largest gas storage facility in China at depths over 5,000 meters [1] - The new gas collection station at Yaha can achieve a maximum daily gas output of 20 million cubic meters, playing a crucial role in seasonal peak regulation, emergency supply, and national energy strategy reserves for the West-to-East Gas Transmission project [1] Gas Injection and Technology - The gas storage facility operates for 7 months of gas injection and 4 months of gas extraction annually, utilizing domestically developed 40 MPa high-pressure large-capacity centrifugal gas injection compressors, achieving 100% localization of equipment [3] - The mechanical performance and testing indicators of the compressors have reached international advanced levels, filling a domestic gap in technology [3] Annual Injection Achievement - Concurrently with surface construction, the Tarim Oilfield has proactively initiated annual gas injection for four gas storage facilities around the Tarim Basin, achieving a record gas injection volume of 1.2 billion cubic meters [5]

视频丨进度条刷新 塔里木盆地最大储气库地面扩建工程完工 - Reportify