Liberty Gold Reports Consistent Gold Grades from Infill Drilling at Black Pine Gold Project, Idaho
Globenewswire·2025-12-03 11:00

Core Insights - Liberty Gold Corp. announced positive results from its 2025 resource infill drilling program at the Black Pine Oxide Gold Project in Idaho, confirming the geological model of gold mineralization [1][4][6] Drilling Results - Recent drill results include 0.68 g/t Au over 24.4 meters and 0.81 g/t Au over 22.9 meters at Rangefront, and 0.61 g/t Au over 71.6 meters at Discovery [1][4] - The drilling program is ongoing, with 21 holes reported from Rangefront and approximately 30 additional holes pending results [7] Resource Growth and Feasibility Study - The infill drilling is converting Inferred resources to Indicated and is expected to enhance confidence in the resource model ahead of the Feasibility Study, which is projected to include around 40,000 meters of new drilling [6][8] - The Feasibility resource update is anticipated to be completed in early Q1 2026, with ongoing drilling expected to reach 33,000 meters by mid-December 2025 [6][8] Metallurgical Drilling - In addition to exploration drilling, metallurgical core drilling has been completed, with results expected in early 2026, contributing to the Phase 10 metallurgical program [8] Geological Model Validation - Drilling at both the Rangefront and Discovery zones has validated the resource model and improved confidence in the metallurgical classification, indicating potential for resource expansion [4][12]