RETRANSMISSION: Manganese X Energy Corp. Kicks Off Battery Hill Prefeasibility Study, Selecting ABH Engineering Inc. and GEMTEC Consulting Engineering and Scientists Limited
Newsfile·2025-12-03 12:00

Core Viewpoint - Manganese X Energy Corp. has initiated a Prefeasibility Study (PFS) for its Battery Hill project, selecting ABH Engineering Inc. and GEMTEC Consulting Engineering and Scientists Ltd. to lead the study, which aims to optimize project economics and environmental stewardship [2][4][5]. Group 1: Project Overview - The PFS for the Battery Hill High Purity Manganese (HPMSM) project is set to begin immediately, with completion targeted for 2026 [3]. - The Battery Hill project is located near Woodstock, New Brunswick, Canada, and is one of the largest manganese carbonate deposits in North America, strategically positioned 15 km from the U.S. border [7]. Group 2: Engineering and Environmental Components - ABH Engineering will oversee major technical components of the PFS, including mine design, production scheduling, and overall project execution strategy [6]. - GEMTEC will handle environmental, geotechnical, hydrogeological, and community-impact assessments necessary for project advancement and permitting [6]. Group 3: Strategic Importance - The PFS aims to reflect high standards of environmental responsibility and technical rigor, optimizing the project's flowsheet to maximize long-term shareholder value [4][5]. - The project is positioned to become one of North America's first HPMSM production hubs, catering to the electric vehicle and energy-storage sectors [5]. Group 4: Company Mission - Manganese X aims to advance the Battery Hill project into production, becoming the first publicly traded manganese mining company in Canada and the U.S. to commercialize EV-compliant high purity manganese [9].