Core Insights - The Purepoint and IsoEnergy Joint Venture has approved an expanded exploration program for 2026 to advance the Nova Discovery at the Dorado Project following strong drilling results in 2025 [1][2] Program Summary - The winter 2026 drill program will consist of 10 skidder-supported drill holes totaling approximately 4,300 metres, focusing on the corridor between drill holes PG25-03 and PG25-07A, with step-outs to the northeast where the strongest mineralization was found [3][7] - A summer 2026 helicopter-supported drill program will include 7 holes totaling approximately 3,150 metres to test conductive and structural targets across various grids [5][7] - An airborne magnetotellurics (MT) survey is planned for late winter or spring to refine deeper structural targets [4][7] Project Details - The Dorado Project is a flagship project of the IsoEnergy-Purepoint 50/50 joint venture, covering over 98,000 hectares of prime uranium exploration ground, including former properties favorable for uranium deposition [15][20] - Recent drilling has confirmed the continuity of fertile graphitic rock packages, indicating potential for additional high-grade discoveries across the region [16]
Purepoint and IsoEnergy Joint Venture Approves 2026 Program to Advance the Nova Discovery at the Dorado Project
Newsfile·2025-12-04 11:30