Core Insights - In November, the national railway transported a total of 184 million tons of coal, marking a year-on-year increase of 0.3%, with thermal coal accounting for 128 million tons, ensuring sufficient supply for winter heating and power generation needs [1] Group 1: Coal Transportation Capacity - The railway authorities are enhancing coal transportation capacity by utilizing major rail corridors such as Daqin, Tangbao, Wari, and Haoji, optimizing resources, and increasing the operation of heavy-load trains [2] - In November, the Daqin line transported 37.22 million tons (up 1.8% YoY), the Tangbao line 11.49 million tons (up 22.7% YoY), the Wari line 13.40 million tons (up 0.5% YoY), and the Haoji line 10.43 million tons (up 11.1% YoY) [2] Group 2: Electric Coal Transportation Organization - The railway is optimizing the organization of electric coal transportation by leveraging a unified command system, ensuring that transportation resources are directed towards meeting electric coal demands [2] - Coordination with other transportation modes, such as road and port, is being strengthened to ensure efficient loading and unloading processes [2] Group 3: Precision Supply Implementation - The railway is closely monitoring coal consumption and inventory levels at key power plants, prioritizing the loading of coal for power generation and heating [3] - A total of 37 supply dispatch orders have been issued to meet the coal transportation needs of power plants in regions like Beijing-Tianjin-Hebei, Shandong, and Henan [3] - Future efforts will focus on weather changes and coal transportation demands to ensure effective supply to key areas and power plants during winter [3]
11月国家铁路累计发送煤炭1.84亿吨 同比增长0.3%
Zhong Guo Xin Wen Wang·2025-12-05 04:55