中国燃气助力栾川鑫曙博远 15MW/30MWh储能项目打造选矿行业能源新范式
Zheng Quan Ri Bao Wang·2025-12-08 07:41

Core Viewpoint - The collaboration between China Gas Holdings Limited and Luanchuan Xinshi Boyuan Mining Co., Ltd. on a 15MW/30MWh commercial energy storage project is a significant step towards optimizing energy structure and achieving low-carbon production in the mineral processing industry [1][2] Group 1: Project Overview - The energy storage project is designed to address the high energy consumption characteristics of multi-metal mining, aiming to create an efficient and green energy system for Luanchuan Xinshi Boyuan [1] - The project includes 6 DC cabins and 4 power conversion systems, tailored to meet the electricity load characteristics of the mining production line [1] Group 2: Technical Specifications - The project utilizes a fully liquid-cooled lithium iron phosphate system with a charge and discharge efficiency exceeding 87% [2] - The liquid cooling temperature control technology maintains battery temperature within ±3℃, ensuring stable output in the complex environment of the mining workshop [2] - The system features a "black start" capability, allowing it to supply power to mining equipment during grid failures, preventing resource waste and production stoppages [2] Group 3: Economic and Environmental Impact - Once operational, the energy storage project will significantly reduce electricity costs for mining production through peak shaving and valley filling, while enhancing the efficiency of electricity resource utilization [2] - The project aims to reduce carbon emissions from fossil energy consumption, helping the company establish a green production image in the multi-metal mining sector [2] Group 4: Future Outlook - China Gas Holdings Limited views the project as an important layout in the mineral processing field and plans to continue exploring energy transition needs in the resource processing industry [2]