Core Viewpoint - Huaneng Group has announced the public tender for the preliminary engineering consulting services of the fifth phase coal power project at the Dezhou Power Plant in Shandong Province, which has been approved by the project approval authority and is funded by the company itself [1][5]. Group 1: Project Overview - The project involves the construction of two 1,000 MW combined heat and power coal-fired units at the original site of units 1-4 of the Dezhou Power Plant [1][5]. - The consulting services include the preparation of eight preliminary engineering consulting reports, such as feasibility studies and environmental impact assessments [2][7]. Group 2: Tender Details - The tender is divided into one package for the preliminary engineering consulting services of the fifth phase coal power project [1][5]. - The service location is specified as 1868 Dongfeng West Road, Decheng District, Dezhou City, Shandong Province [1][5]. Group 3: Requirements for Bidders - Bidders must be legally registered independent legal entities within the People's Republic of China and must not be under any administrative sanctions or bankruptcy procedures [3][8]. - Bidders are required to have comprehensive Class A qualifications in engineering surveying and design, and must have completed at least two feasibility study reports or design contracts for coal power projects of 1,000 MW or above since January 1, 2015 [3][8]. Group 4: Timeline - The time frame for obtaining the tender documents is from December 5, 2025, 09:00 to December 11, 2025, 17:00 [4][9].
2×100万千瓦煤电项目前期工程咨询招标