Osisko Development Launches Fully-Funded 70,000-Meter Exploration Drilling Campaign Targeting New Discoveries at Cariboo Gold Project

HIGHLIGHTS1 Fully-funded 70,000-meter exploration drill program launched with two drill rigs already operating at the Cariboo Gold Project site, and ramping up to six drill rigs as the program advances through the end of 2026Priority exploration targets and initial planned drilling: Cariboo Deep (~10,000 m, 11 holes) – targeting areas at depth beneath the existing deposit within the permitted Cariboo Gold Project mine plan boundary. Total existing mineral reserves and resources at CGP include 2.07 Moz Au of ...