我国首个燃机发电智控系统投运
Ke Ji Ri Bao·2025-12-10 00:42

Core Insights - The successful operation of China's first intelligent autonomous control system for gas turbine power generation marks a significant advancement in the country's thermal power generation technology, transitioning from traditional manual monitoring to intelligent autonomous operation [1] - The project, implemented by Huaneng East China Company, showcases the integration of AI large models with power production mechanism models, enabling automatic data collection and precise equipment status assessment [1] Group 1: Technological Advancements - The system allows for the entire process of gas turbine operation, including startup, grid connection, load adjustment, and shutdown, to be controlled autonomously without human intervention [1] - During trial operation, the unit successfully completed both cold and hot state startup and shutdown tests, achieving a key operational parameter compliance rate of 100% [1] Group 2: Industry Implications - This development is expected to accelerate the digital and intelligent transformation of the traditional energy industry in China [1] - The intelligent control system provides a new smart solution for the construction of China's new power system, enhancing operational efficiency and reducing risks associated with manual operations [1]