海南“十五五”规划建议:加快海上风电、分布式光伏等项目建设 构建源网荷储融合发展的新型电力系统
Zheng Quan Shi Bao Wang·2025-12-10 02:40

Core Viewpoint - The Hainan Provincial Committee of the Communist Party of China has proposed to accelerate the construction of a new energy system as part of the 15th Five-Year Plan for national economic and social development [1] Group 1: Energy Infrastructure Development - The plan emphasizes the orderly implementation of a series of energy infrastructure projects based on the principle of "moderate advance and leaving room" [1] - Key projects include the acceleration of offshore wind power and distributed photovoltaic projects [1] - The construction of a flexible mutual aid project for high-voltage transmission lines from Hainan to Guangdong is highlighted [1] Group 2: Power System Enhancement - The initiative aims to build a new power system that integrates source, network, load, and storage [1] - There is a focus on enhancing the support capabilities of nuclear power and gas power [1] - The plan includes the optimization and improvement of a robust backbone power grid and the creation of a flexible and reliable new distribution network [1] Group 3: Energy Transition and Electrification - The proposal encourages the deep promotion of electrification in industries, buildings, transportation, and agriculture [1] - It aims to improve the electrification level of end-use energy [1] - The plan also emphasizes the scientific layout of pumped storage and the vigorous development of new energy storage [1] Group 4: Oil and Gas Supply Network - Strengthening the oil and gas supply network is a key component of the plan [1] - The orderly advancement of urban and rural gas infrastructure construction is also prioritized [1]

海南“十五五”规划建议:加快海上风电、分布式光伏等项目建设 构建源网荷储融合发展的新型电力系统 - Reportify