Core Viewpoint - Kazakhstan's oil production faces a risk of reduction due to ongoing delays in maintenance work at key Black Sea export mooring facilities [1] Group 1: Current Situation - Only one of the three mooring points at the Black Sea CPC terminal is currently operational, with one severely damaged by a Ukrainian drone and another under maintenance [1] - The CPC requires at least two mooring points to operate simultaneously to maintain Kazakhstan's full export capacity [1] Group 2: Implications - Limited current capacity has led to a continuous accumulation of inventory at storage facilities [1] - Maintenance work is now expected to be completed by December 15, taking longer than previously anticipated [1] - If the situation persists, storage facilities may soon reach full capacity, forcing Kazakhstan to cut production [1] Group 3: Strategic Importance - The CPC oil terminal is the only major channel for exporting crude oil from Kazakhstan's largest oil fields and also transports some Russian crude [1]
哈萨克斯坦石油出口受阻 面临减产风险
Ge Long Hui A P P·2025-12-10 10:23