山东肥城:“搭积木”式建房告别“慢散贵”
Qi Lu Wan Bao·2025-12-11 08:25

Core Insights - The construction industry in Shandong Tai'an is shifting from traditional manual labor to industrialized prefabrication, with a focus on "building blocks" style construction that is gaining market popularity [1][2][3] Group 1: Construction Methodology - The new construction method involves prefabricated concrete houses that are assembled on-site, significantly reducing construction time and improving cleanliness compared to traditional methods [1][2] - The prefabricated components are produced in a controlled factory environment, ensuring higher quality and consistency, with strength exceeding traditional concrete by over 20% [3] Group 2: Cost and Time Efficiency - The new party service center project cost over 80,000 yuan for six prefabricated rooms, with an office area of more than 180 square meters, saving over 70,000 yuan and reducing construction time by more than three months compared to traditional building methods [2] - The company is able to fulfill customized orders quickly, with production times for specific projects being less than 20 days [3] Group 3: Market Expansion and Future Plans - The company has expanded its market reach beyond local areas to cities like Jining and Liaocheng, with orders extending into the next spring [3] - Future plans include increasing production capacity to 1,000 houses per year and diversifying product offerings to include small factories and tourist stations, aiming to enhance the brand of "Ficheng-made" prefabricated buildings [3]

山东肥城:“搭积木”式建房告别“慢散贵” - Reportify