Group 1 - The Yunyang South Road rapid transformation project has successfully passed pre-acceptance, marking a significant milestone towards its opening for traffic [1][3] - The project, approximately 2.9 kilometers long with a 2.5-kilometer elevated section, is designed to enhance the urban traffic network in Yangzhou [3][4] - The project is expected to improve overall traffic capacity by about 40% and reduce travel time from Chaohe to the city center by 15-20 minutes [4] Group 2 - The pre-acceptance was organized by Yangzhou Chengkong Group and involved multiple municipal departments to ensure compliance with design standards [3] - The project includes three sets of up and down ramp bridges and is strategically important for connecting various urban areas [3][4] - Following the pre-acceptance, the construction team will focus on final adjustments and optimizations to prepare for the final acceptance and official opening [4]
扬州润扬南路快速化改造工程即将通车,通车后区域整体通行能力预计提升四成
Yang Zi Wan Bao Wang·2025-12-14 05:21