嘉泽新能:拟布局两大风电项目 追风逐日绘就绿色能源新蓝图

Group 1 - The company, Jiaze New Energy, announced plans to invest approximately 2.366 billion yuan in two wind power projects, with the Dunhua Zerui New Energy 300MW project estimated at 1.631 billion yuan and the Longan Banlan 150MW project at 735 million yuan [1] - Additionally, the company plans to invest 3.557 billion yuan in a green hydrogen and methanol aviation fuel co-production project in Jixi City, Heilongjiang Province, entering the green chemical sector [1] - The two wind power projects are located in the Changbai Mountain area of Jilin and the Liuzhou mountainous region of Guangxi, utilizing large-capacity wind turbines of 7.7 MW and 7.5 MW respectively to enhance power generation efficiency [1] Group 2 - The company has established a comprehensive development framework in the green energy sector, including five key areas: renewable energy power station development, operation and management services, distributed rooftop photovoltaics, renewable energy industry funds, and equipment manufacturing [2] - Wind power serves as the foundation of the company's development, leveraging policy advantages from the "West-to-East Power Transmission" strategy in Ningxia, and employing a unique "full lifecycle + guaranteed power generation" operational model [2] - As of June this year, the company has a total installed capacity of 2.32 GW, with over 2 GW from wind power, 30 MW from centralized photovoltaics, and 238.268 MW from distributed rooftop photovoltaics, along with 150 MW/300 MWh of grid-connected energy storage projects [2]

Jiaze Renewables-嘉泽新能:拟布局两大风电项目 追风逐日绘就绿色能源新蓝图 - Reportify