复兴路(新武金堤路—白沙洲大道)全线贯通
Chang Jiang Ri Bao·2025-12-15 11:21

Core Viewpoint - The completion of the Fuxing Road project significantly enhances transportation connectivity in the Baishazhou area, benefiting nearly 30,000 residents by improving access and reducing travel time to major roads [1][4][6]. Group 1: Project Overview - Fuxing Road, located in Wuchang District, has a total length of 1,379 meters, with the specific section from Xinwujin Road to Baishazhou Avenue measuring 444 meters long and 40 meters wide, featuring six lanes for two-way traffic [4]. - The project includes road construction, drainage systems, traffic lighting, and landscaping, and is a key transportation artery in Wuhan [4][9]. Group 2: Impact on Local Residents - Residents near the Bapu Street subway station, such as Guo Qiang from Century New Yangtze, reported that the new road reduces travel time to Baishazhou Avenue from 15 minutes to just 2 minutes, alleviating previous traffic congestion [6]. - The road's opening facilitates better access for residents of nearby communities, including Century New Yangtze, Tiedong Community, and Bapu Street, significantly improving the regional traffic environment [4][9]. Group 3: Transportation Integration - The Fuxing Road completion integrates regional transportation, with two entrances of Line 5's Bapu Street station located within the new road section, enhancing the connection between rail and surface public transport [9]. - The new road creates a continuous route from Jiyu Bridge through the Yellow Crane Tower Tunnel to the second, third, and fourth ring roads, providing a vital second main road linking the Baishazhou area to the core of Wuchang [9].