Bitdeer monthly bitcoin production jumps 251% as hashrate hits 45.7 EH/s

Production Growth - Bitdeer mined 526 bitcoin in November 2025, a 251% increase compared to the same period last year [1] - The production growth is attributed to the deployment of proprietary SEALMINER rigs, with a self-mining hashrate of 45.7 EH/s [1] Future Projections - The company expects to surpass 50 EH/s by the end of the year, joining other public miners with similar capacity [2] - Currently, Bitdeer has 34.3 EH/s of SEALMINER A2 model deployed and 3.3 EH/s in transit, along with 0.6 EH/s of the new A3 model deployed and 2.9 EH/s in transit [2] ASIC Chip Development - Bitdeer's SEAL04-1 chip demonstrated power efficiency of approximately 6-7 J/TH, with mass production targeted for Q1 2026 [3] - The SEAL04 chip's production was delayed, leading to a split in design and rollout into two batches: SEAL04-1 and SEAL-02 [3] High-Performance Computing Division - The high-performance computing division is on track to earn approximately $10 million in annual recurring revenue as of November, up from $8 million in October [4] - Expansion of AI infrastructure includes a new 2 megawatt data center in Malaysia, expected to launch by the end of 2025 [4] Data Center Expansion - The company is evaluating leasing opportunities for data centers in the U.S., including a 13 megawatt site in Wenatchee, Washington, and a 35 megawatt project in Knoxville, Tennessee [5] Setbacks - A localized setback occurred at Bitdeer's site in Massillon, Ohio, due to a fire, postponing the energization of approximately 26 megawatts [6] - The remaining 174 megawatts at the location are scheduled to come online in Q2 2026 [6]