Core Viewpoint - The successful completion of the solar-storage project at the Abidjan Gold Mine in Côte d'Ivoire marks a significant achievement for Zhaojin Mining, enhancing operational efficiency and reducing costs while addressing power supply challenges [1][2]. Group 1: Project Overview - The solar-storage project has a capacity of 33.28 MWp and 37.50 MWh, and it has been successfully connected to the grid [1]. - The project resolves the power supply bottleneck that has hindered stable and efficient operations at the Abidjan Gold Mine since 2025 [1]. Group 2: Operational Impact - The implementation of a multi-energy complementary smart microgrid system, combining solar, storage, grid electricity, and diesel power, allows for seamless switching between grid-connected and off-grid modes [1]. - This system effectively mitigates issues related to power shortages and equipment downtime, ensuring continuous and stable production at the mine [1]. Group 3: Strategic Significance - The project is the first large-scale renewable energy demonstration power station for mines in Côte d'Ivoire following the introduction of the country's New Energy Law, showcasing Zhaojin Mining's commitment to ESG principles and green mining [2]. - The successful execution of this project serves as a model for responsible development in overseas investments by Chinese mining companies, setting a green benchmark for the internationalization of the Chinese gold industry [2]. Group 4: Future Plans - During the 14th Five-Year Plan period, Zhaojin Mining aims to accelerate the construction and operation of key overseas projects, including the Abidjan Gold Mine, Odlan Mining, and King Gold Mining, leveraging the verified global integrated operational support system [2]. - The company is focused on establishing an overseas mining industry cluster and becoming a flagship for the globalization of the Chinese gold mining sector [2].
光储落位首战告捷!招金矿业(01818)全球一体化运营保障体系为海外扩产增效注入硬核动能