Core Viewpoint - Inner Mongolia is actively ensuring energy security and stable supply during the peak winter season, implementing multiple measures to address challenges posed by cold weather [1] Group 1: Energy Supply Measures - Shengli Energy Company has developed a scientific coal mining operation plan and optimized equipment scheduling to maximize production potential, achieving a coal output of 1.227 million tons by December 15, exceeding its target [2] - Inner Mongolia Electric Power Group is conducting infrared temperature measurements and drone inspections on key power lines to enhance equipment operation and ensure reliable electricity supply [3] - The region has established 290 coal mines with an average daily output of 3.3 million tons, and has built 17 coal transportation channels with an annual capacity of approximately 1.45 billion tons to meet coal supply demands [5] Group 2: Infrastructure and Emergency Preparedness - The Inner Mongolia Electric Power Group is focusing on special inspections of key infrastructure for heating, water, and gas supply to eliminate potential hazards and ensure reliable service during peak demand [4] - The region's power grid structure is continuously improving, with a power delivery capacity of about 75 million kilowatts, supporting electricity supply and the integration of new energy sources [5] - The local energy bureau plans to strengthen energy security capabilities, promote stable coal production, and improve the coal reserve system to ensure long-term energy supply stability [6]
内蒙古全力保障能源稳定供应
Nei Meng Gu Ri Bao·2025-12-19 03:37