天齐锂业(002466.SZ):泰利森第三期化学级锂精矿扩产项目己经建设完成并正式投料试车
Ge Long Hui A P P·2025-12-19 08:57

Core Viewpoint - Tianqi Lithium Industries (002466.SZ) has completed the construction and trial operation of the third phase of the Talison chemical-grade lithium concentrate expansion project, which is expected to enhance the company's production capacity and profitability [1] Group 1: Project Completion and Capacity - The Talison third phase chemical-grade lithium concentrate expansion project was completed and officially started trial production on December 18, 2025 [1] - After the project is fully operational, the total production capacity of the Talison lithium concentrate project will reach 2.14 million tons per year [1] Group 2: Supply and Resource Matching - The chemical-grade lithium concentrate required for the company's domestic and international lithium chemical product production bases mainly comes from the Greenbushes lithium spodumene mine owned by the company's wholly-owned subsidiary, Wanfielder [1] - The completion of the Talison expansion project will provide a continuous and sufficient raw material supply for the company's production bases, enhancing the efficient matching of capacity and resources [1] Group 3: Industry Synergy and Profitability - The project is expected to strengthen the synergy between the upstream and downstream of the industry chain, which may further improve the company's profitability [1]

TLC-天齐锂业(002466.SZ):泰利森第三期化学级锂精矿扩产项目己经建设完成并正式投料试车 - Reportify