Core Viewpoint - The Hong Kong government has introduced a new sampling inspection system for protective scaffolding materials used in construction projects, which applies to both repair and new building works [1] Group 1: New Regulations - The new system requires contractors to sample and test each batch of protective materials according to specified methods, with testing conducted by government-designated laboratories [1] - If any sample from a batch fails the test, the entire batch is deemed unusable; only batches with all passing samples can be approved for use [1] - Currently, there are five designated laboratories for testing, and this list will be updated continuously [1] Group 2: Implementation and Compliance - The government aims to have the first batches of scaffolding materials available for use within one month after procurement and testing [1] - Contractors must notify the Buildings Department within seven days of the materials being ready for use, and the department will conduct random inspections of projects [1] - If any sample from an inspected facade fails, all protective materials on that facade must be removed [1] Group 3: Documentation Requirements - Before materials arrive at the construction site, contractors must obtain and keep a fire resistance test report from suppliers, which must be displayed prominently at the site [1] - The test report must include details about the manufacturer, origin, performance standards, and testing methods and results [1]
香港推棚网抽检新规 首批合规物料争取一个月内上架
Xin Lang Cai Jing·2025-12-19 17:25