Core Insights - The "Two Rivers Mouth Computing Power Integration Demonstration Project" has been launched in Ganzi Prefecture, Sichuan Province, leveraging the Two Rivers Mouth Super Reservoir Power Station, marking it as the first computing power integration project in the Yarlung Zangbo River Basin and the first high-altitude rock cavern computing power center in the country [1][3]. Investment and Infrastructure - The total investment for the project is approximately 350 million yuan, deploying 2,000 domestic computing power chips, including six computing power cabins, providing a peak computing power of about 600 PFLOPS (floating-point operations per second) [3]. - The project is located within the construction tunnel of the Two Rivers Mouth Hydropower Station, designed for a lifespan of 50 years, with an earthquake resistance level of 8 degrees [3]. Energy and Sustainability - The project utilizes abundant clean energy from the Two Rivers Mouth and surrounding areas, forming a stable energy supply system that integrates "water, wind, solar, hydrogen storage, and computing power" for efficient utilization [3]. - It aims to meet the computing center's year-round 100% reliable power supply needs, achieving a "zero-carbon computing power" supply [3].
全国首个,正式投运!部署2000张国产算力芯片
Huan Qiu Wang Zi Xun·2025-12-20 01:02