Core Viewpoint - The completion of the last concrete pour for the roof of the station building at Jiangxi Xunwu Station marks significant progress in the construction of the Ruimei Railway, laying a solid foundation for the timely operation of the entire line [1][5]. Group 1: Project Overview - The Ruimei Railway runs from Ruijin City in Jiangxi Province to Meizhou Station in Guangdong Province, with a total length of 240.29 kilometers and a design speed of 160 kilometers per hour [1]. - The Jiangxi section of the railway is 165.23 kilometers long and includes five stations: Ruijin, Huichang, Anyuan, Tianxin, and Xunwu [1]. Group 2: Station Design and Cultural Integration - The three new passenger station buildings each have an area of approximately 4,000 square meters and are designed with a "2 platforms and 4 lines" configuration [3]. - The design philosophy incorporates red culture and traditional Hakka architectural elements, creating a blend of modern simplicity and cultural significance [3]. - Each station reflects local cultural themes: Huichang Station symbolizes the "red flag," Anyuan Station resembles flowing water, and Xunwu Station combines book imagery with traditional architectural features [3]. Group 3: Construction Progress and Future Plans - The construction of the railway's substructure is progressing efficiently, with major technical challenges overcome, including the completion of the longest bridge, the Mianshui Grand Bridge [5]. - The project is set to transition to the installation of "four electrical" systems (communication, signaling, power, and electrification) and track laying by the end of December [5]. - The Ruimei Railway is one of the 102 key projects outlined in the national "14th Five-Year Plan," aimed at improving transportation infrastructure in the revolutionary old areas of Jiangxi Province and enhancing regional economic vitality [5].
瑞梅铁路江西段新建站房全部圆满封顶
Xin Lang Cai Jing·2025-12-20 08:46