黄河内蒙古河段进入封河关键期 国家防总派工作组协助指导防凌
Xin Lang Cai Jing·2025-12-20 12:56

Core Viewpoint - The Yellow River in Inner Mongolia has entered a critical freezing period, prompting the National Flood Control and Drought Relief Headquarters to dispatch a working group to assist in flood prevention efforts [1] Group 1 - The freezing length of the Yellow River in Inner Mongolia is continuously increasing, indicating a heightened risk of ice flood disasters [1] - A working group led by Chen Min, Deputy Minister of Emergency Management and Water Resources, has been deployed to the frontline to oversee flood prevention measures [1] - The working group emphasized the challenges posed by sudden ice flood disasters, particularly in Inner Mongolia, where extreme weather events have complicated flood prevention efforts [1] Group 2 - The working group has mandated the implementation of a flood prevention responsibility system and the continuous improvement of emergency response plans [2] - There is a focus on conducting thorough hazard inspections and removing obstacles that significantly affect the river's ice flow, such as floating bridges and construction platforms [2] - Enhanced monitoring and forecasting capabilities are required to ensure timely issuance of flood warnings, along with scientific management of flood prevention projects to control river freezing flow [2]