滇藏线上首座中国石油重卡充电站投运 破解进藏货运补能难题
Xin Hua Cai Jing·2025-12-21 07:00

Core Viewpoint - The opening of the Dongshan heavy-duty truck charging station, built by China Petroleum Yunnan Sales Company, marks a significant advancement in the energy supply infrastructure along the strategic transportation corridor connecting Sichuan, Yunnan, and Tibet, achieving a breakthrough from "zero to one" in new energy refueling capabilities [1] Group 1: Infrastructure Development - The Dongshan charging station is located in the Jingshan High-tech Industrial Development Zone in Lijiang, Yunnan Province, strategically positioned at a critical junction for transportation into Sichuan and Tibet [1] - The station is surrounded by key industrial bases, such as the Southwest Cement Plant, and is directly connected to major highways, creating a seamless energy supply layout known as the "Golden Triangle" [1] Group 2: Service Capabilities - The station is equipped with 8 DC fast charging spots, each with a capacity of 120KW, allowing simultaneous charging for 8 medium and large new energy freight vehicles [1] - This facility significantly reduces charging time, addressing the core issues of "charging difficulty and slow charging" faced by long-haul freight drivers [1] Group 3: Strategic Importance - The charging station provides essential energy support for major national projects, including the construction of the Sichuan-Tibet Railway and the development of hydropower stations in Diqing and Tibet [1]

PETROCHINA-滇藏线上首座中国石油重卡充电站投运 破解进藏货运补能难题 - Reportify