北京地铁3号线一期东段工程启动建设
Xin Lang Cai Jing·2025-12-21 17:39

Core Insights - The Beijing Subway Line 3 East Section has officially entered the construction phase, which is a crucial part of the line's eastward extension, aiming to enhance the east-west transit function and improve the northeastern urban rail network [1][2] Group 1: Project Overview - The East Section of Line 3 will span approximately 5.1 kilometers, connecting from Guanzhuang Road West Entrance Station to Caogezhuang North Station, with a total of five stations planned [1] - Key stations include Guanzhuang Road West Entrance Station, which will serve as an interchange with the planned R4 line, and Gaoxin Zhuang Station, which will have future connections to the M101 line [1][2] Group 2: Impact and Benefits - The completed East Section will alleviate traffic pressure in the Dongba area and strengthen the connection between the central city and the sub-center, enhancing network efficiency through connections with R4 and M101 lines [2] - It will directly serve key functional areas such as the Jinzhan International Cooperation Service Area, promoting international engagement and driving industrial upgrades along the line [2] - The project emphasizes station-city integration, optimizing urban spatial structure and regional economic collaboration, while also providing a rapid commuting option for residents and promoting sustainable travel [2] Group 3: Construction Challenges - The construction will traverse major urban roads and areas with dense underground pipelines, presenting significant challenges due to the complex working environment [2] - The implementation of this project is a key measure to fulfill Beijing's rail transit network planning and enhance the overall urban transportation system [2]

北京地铁3号线一期东段工程启动建设 - Reportify