22日通车!广州⇌湛江高铁只要1.5小时
Yang Shi Xin Wen·2025-12-21 18:17

Core Viewpoint - The opening of the Guangzhou-Zhanjiang high-speed railway significantly reduces travel time between the North Bay city cluster and the Guangdong-Hong Kong-Macao Greater Bay Area, supporting high-quality regional economic and social development [1][16]. Group 1: High-Speed Railway Details - The Guangzhou-Zhanjiang high-speed railway has a total length of 401 kilometers and a design speed of 350 kilometers per hour, connecting multiple cities including Guangzhou, Foshan, Zhaoqing, Yunfu, Yangjiang, Maoming, and Zhanjiang [3][6]. - The railway allows for travel from Guangzhou Baiyun Station to Zhanjiang North Station in as little as 1 hour and 32 minutes, with the fastest travel time from Guangzhou to Zhanjiang reduced by 61 minutes compared to previous routes [6][16]. - Initial operations will feature up to 64 high-speed trains daily, with flexible pricing mechanisms implemented to cater to diverse passenger needs [6][7]. Group 2: Supporting Infrastructure - The Zhanjiang North Train Operation Depot, a key supporting project for the high-speed railway, is located approximately 2.3 kilometers from Zhanjiang North Station and is essential for the maintenance and operation of high-speed trains [9][14]. - The depot includes facilities for inspecting and maintaining up to 12 standard high-speed trains simultaneously, with a maximum capacity for daily maintenance of 36 trains [9][14]. - The operational readiness of the depot enhances the overall efficiency of the railway network and supports the integration of the West Guangdong region into the Greater Bay Area's transportation framework [14][16].