Core Insights - Beijing's upcoming subway lines, including the 17th line mid-section, 18th line, and the southern extension of the 6th line, will add approximately 30.1 kilometers to the city's rail network, bringing the total operational mileage to 909 kilometers, enhancing the overall capacity and service level of the capital's transportation system [2][3][5] Group 1: New Subway Lines - The 17th line mid-section, spanning about 8.2 kilometers with 4 stations, will connect the southern and northern parts of the city, allowing a travel time of 66 minutes from the southern terminus to the northern terminus [2][5] - The 18th line, approximately 19.8 kilometers long, will serve as a key east-west route in the northern region, featuring 11 stations, including 4 transfer stations, with a travel time of just over 30 minutes from end to end [3][5] - The southern extension of the 6th line will extend about 2.1 kilometers to the newly constructed Luyang Station, significantly improving the connection between the urban sub-center and the central city [3][5] Group 2: Station Design and Aesthetics - The 17th line mid-section will incorporate a "Science and Innovation Future" theme, with stations reflecting local cultural elements, such as the new Chinese style at Yong'anli Station [3][4] - The 18th line will feature a "Light and Shadow Tunnel" design theme, emphasizing a bright and warm waiting atmosphere, with the unique design of the first large-span column-free station in Beijing at the Longguan West Street Station [4][5] - The Luyang Station on the 6th line will utilize a "bare concrete" design, enhancing construction efficiency and environmental performance while showcasing a minimalist aesthetic [4][5] Group 3: Engineering Innovations - The construction of the 17th line mid-section faced complex conditions, including integration with existing infrastructure and minimizing environmental impact during construction [5][6] - The 18th line will employ advanced monitoring and dynamic adjustment systems to ensure safety while crossing critical infrastructure, and it will be a demonstration line for smart construction practices [5][6] - The 6th line southern extension successfully completed track connections and signal system upgrades without disrupting existing operations, highlighting the project's technical challenges [6]
本市轨道交通运营里程超900公里
Bei Jing Wan Bao·2025-12-22 06:52