Core Viewpoint - The construction of the 200,000-ton channel project at Tieshan Port in Beihai, Guangxi has officially commenced, marking the full launch of the land-based engineering phase of the project [1][2]. Group 1: Project Overview - The Tieshan Port 200,000-ton channel project is contracted to China Communications Guangzhou Navigation Bureau Co., Ltd., with the first construction section's contract amounting to approximately 954 million RMB [2]. - The total length of the channel is 6.1 kilometers, with a total dredging volume of 11.348 million cubic meters, and the construction cofferdam spans 5,630 meters, representing the most complex geological conditions and highest construction difficulty of the entire channel [2]. - The project is part of a larger infrastructure initiative, with the entire channel planned to be 67.4 kilometers long and a total dredging volume exceeding 57 million cubic meters [2]. Group 2: Project Significance and Timeline - The Tieshan Port channel project is a key infrastructure project for Guangxi, playing a significant role in integrating the region into the new western land-sea corridor [2]. - As of now, over 30% of the total project volume has been completed, with the project expected to be finished by the end of 2027 [2]. - Upon completion, the channel will enable 200,000-ton vessels to navigate year-round, significantly enhancing the port's navigation efficiency and transportation capacity [2].
广西北海铁山港20万吨级航道陆域工程全面启动
Zhong Guo Xin Wen Wang·2025-12-22 11:52