西宁首次成功使用绝缘脚手架带电接火作业
Xin Lang Cai Jing·2025-12-22 19:20

Core Viewpoint - The successful use of insulated scaffolding for live-line work in Qinghai Province marks a significant advancement in improving power service levels and enhancing customer satisfaction in electricity supply [1][2]. Group 1: Project Implementation - The live-line work was initiated based on customer demand to ensure that local residents' electricity supply was not affected [1]. - The work site was located in a farmland area with narrow surrounding roads, making it challenging for traditional insulated aerial work platforms to access [1]. - Insulated scaffolding was utilized as a supplementary tool to traditional live-line work equipment, effectively addressing the access challenges posed by the environment [1]. Group 2: Advantages of Insulated Scaffolding - Insulated scaffolding offers unique advantages such as a small footprint, flexible setup, and strong structural stability, allowing for rapid deployment in areas without wide access roads [1]. - The application of insulated scaffolding provides new solutions for live-line work in complex terrains like farmland and mountainous regions [1][2]. - The successful implementation of insulated scaffolding enhances operational safety and efficiency, addressing issues related to traditional work methods such as limited working space and fewer types of ground potential operations [2].