港科大(广州)二期首栋教学楼封顶
Zhong Guo Xin Wen Wang·2025-12-23 09:25

Core Insights - The Hong Kong University of Science and Technology (Guangzhou) project has reached a significant milestone with the topping out of the C11 teaching building, marking the first completed structure in the second phase of the project [1][2]. Group 1: Project Overview - The second phase of the Hong Kong University of Science and Technology (Guangzhou) project is located in the Nansha Qingsheng hub area of Guangzhou, adjacent to the already operational first phase campus, with a total construction area of 730,000 square meters [2]. - The second phase will include various facilities such as teaching buildings, research buildings, micro-nano manufacturing laboratories, ocean dynamics laboratories, and industry-academia-research buildings [2]. Group 2: Strategic Importance - The project aims to serve as a powerful "innovation engine" and an "accelerator" for regional development in the Greater Bay Area, integrating Hong Kong's academic research strengths with the industrial foundation of the mainland [2]. - It is expected to stimulate the development of the surrounding "Innovation Zone around HKUST (Guangzhou)," attracting enterprises, capital, and talent, thereby forming an innovation ecosystem that injects new momentum into high-quality development in Nansha and the industrial upgrade of the entire Greater Bay Area [2]. Group 3: Construction Details - The C11 teaching building features a five-story frame structure with a construction area of approximately 14,900 square meters and a height of 28.5 meters [2]. - The design incorporates a unique curved shape, utilizing prefabricated construction technology to enhance structural precision and quality uniformity, significantly improving construction error control and facilitating subsequent mechanical and decorative installations [2].