“半小时通勤圈”破解城南跨区出行痛点西安地铁15号线开通进入倒计时
Xi An Ri Bao·2025-12-24 02:02

Core Viewpoint - The Xi'an Metro Line 15, a significant part of the city's third-phase urban rail transit plan, is set to enhance cross-district commuting in the southern region, creating a "half-hour commuting circle" and promoting regional development [3][4][6]. Summary by Sections Project Overview - The Line 15 project spans 19.4 kilometers with 13 underground stations, including three transfer stations [4]. - The line connects key areas such as Silk Road Science City, Western University City, and Xi'an Aerospace City, addressing commuting challenges in the southern districts [3][4]. Technological Features - Line 15 utilizes the highest level of automation (GoA4) and features A2-type metro vehicles, with a maximum speed of 100 km/h, which is a 25% increase compared to standard metro lines [6]. - The line incorporates advanced safety and energy-saving technologies, including smoke detection and obstacle detection systems [4][6]. Design and Aesthetics - The design theme "Bow Playing the String" reflects the integration of high-tech, cultural, and aerospace industries along the line [7]. - Notable stations like Aerospace City and Postal University feature unique architectural designs that enhance the cultural experience for passengers [7][8]. Construction and Engineering Challenges - The construction faced significant challenges due to varying terrain and dense population, requiring innovative engineering solutions [9][10]. - Techniques such as "shield tunneling followed by expansion" were employed to minimize environmental impact and construction time [9]. Community Integration - The project includes "micro-renovation" efforts to improve surrounding infrastructure and create community spaces, enhancing the overall urban landscape [9][10]. - Facilities such as P+R parking, bike parking, and public transport connections are integrated to facilitate seamless commuting [10]. Operational Readiness - The line has passed government inspections and is in the final stages of preparation for initial operations, contributing to a total metro network length of 422 kilometers in Xi'an [10].