潍宿高铁站前8标首批上跨日兰高铁钢横梁吊装成功
Zhong Guo Jing Ji Wang·2025-12-24 08:16

Core Insights - The successful installation of the first steel beam for the Weishui-Suqian High-Speed Railway marks a significant milestone in the construction of China's "Eight Vertical and Eight Horizontal" high-speed railway network [1][2] - The project aims to enhance transportation efficiency between Shandong and Jiangsu provinces, facilitating industrial collaboration and resource sharing in the region [2] Group 1: Project Overview - The Weishui-Suqian High-Speed Railway connects Weifang in Shandong with Suqian in Jiangsu, serving as a crucial transportation artery linking the Shandong Peninsula and the Yangtze River Delta [1] - The Linyi section of the project spans 38.566 kilometers and involves the installation of 16 steel beams, with the first two beams weighing 254.08 tons each [1] Group 2: Construction Challenges and Solutions - The installation of the steel beams over operational high-speed rail lines presented significant risks and required precise coordination [1] - The project team developed a specialized construction plan, conducted thorough checks on core equipment, and ensured personnel were adequately trained [2] - A comprehensive safety and technical defense system was implemented, utilizing drone surveillance and a monitoring system to track the installation process in real-time [2] Group 3: Strategic Importance - Upon completion, the Weishui-Suqian High-Speed Railway is expected to significantly improve regional transportation efficiency and contribute to high-quality economic development along the route [2] - The project plays a vital role in enhancing the national high-speed railway network and promoting regional coordinated development [2]

潍宿高铁站前8标首批上跨日兰高铁钢横梁吊装成功 - Reportify