南京首条高速铁路过江隧道建设加速!上元门过江通道江北段正式开建
Yang Zi Wan Bao Wang·2025-12-25 08:56

Core Viewpoint - The construction of the Nanjing Shangyuanmen Cross-River Channel has officially commenced, marking the beginning of a significant infrastructure project that will enhance the connectivity between Nanjing's main urban area and the Jiangbei region, ultimately facilitating a more integrated high-speed rail network [1][7]. Group 1: Project Overview - The Nanjing Shangyuanmen Cross-River Channel is the city's first high-speed railway underwater tunnel, connecting Nanjing North Station and Nanjing Station, with a total length of approximately 20.4 kilometers and a maximum depth of 107 meters [1]. - The project involves a challenging construction segment, with a shield tunnel length of 6.93 kilometers, which is considered a critical engineering component due to its complexity [1][3]. Group 2: Technical Challenges - The project is characterized by five significant features: large scale, length, depth, risk, and precision, with high standards required for construction due to the need to tunnel beneath sensitive structures [3]. - The project team has initiated technical solutions, including intelligent excavation and digital management platforms, to address the challenges posed by the construction environment [5]. Group 3: Impact on Transportation - The completion of the Shangyuanmen Cross-River Channel will alleviate the current bottlenecks in Nanjing's railway network, enhancing the flexibility of transportation and supporting multiple rail lines, including the Ninghuai Intercity Railway and the planned Ningxu Intercity Railway [7]. - This infrastructure will create a rapid passenger transport corridor between Jiangbei and Jiangnan, facilitating easier access for travelers from Jiangbei, Northern Jiangsu, and Southern China to Nanjing's urban center [7][8].