太原机场二跑道成功投运 运行保障能力全面提升
Xin Lang Cai Jing·2025-12-26 00:35

Core Viewpoint - The successful transition to the new second runway at Taiyuan Airport marks a significant milestone in the airport's expansion project, enhancing operational capacity and safety [3][4]. Group 1: Transition Completion - The transition of the second runway was completed smoothly on December 25, 2025, with the first flight taking off on schedule [3]. - A total of 70 support vehicles and 217 personnel were involved in the transition process, which included critical tasks such as the removal of the first runway's navigation lighting system and the activation of the second runway's navigation facilities [3]. Group 2: Runway Specifications and Benefits - The new second runway is located 490 meters south of the first runway's centerline, measuring 3,600 meters in length and 45 meters in width, capable of accommodating Boeing 747-400 and similar aircraft [4]. - The successful operation of the second runway alleviates the long-standing maintenance pressure on the first runway, laying a solid foundation for enhanced safety and reliability at Taiyuan Airport [4]. Group 3: Technological Advancements - The second runway's navigation lighting system utilizes LED energy-saving fixtures and a sine wave dimmer for high power factor operation, contributing to improved energy efficiency [4]. - An intelligent cable warning system and a smart lighting operation management system have been implemented, enabling real-time monitoring and proactive maintenance, thus significantly enhancing operational reliability [4]. Group 4: Future Developments - Following the transition, the first runway will undergo a two-year renovation, with the dual-runway operation expected to commence by the end of 2027 [4]. - The successful transition is a key milestone in the construction of a "four-type airport" and aims to enhance the regional aviation hub's functionality, supporting Shanxi Province's development as a new highland for opening up inland areas [4].