榆炼提前完成年度石脑油生产任务
Zhong Guo Hua Gong Bao·2025-12-26 03:13

Core Insights - Yulin Refinery has achieved a cumulative processing volume of 959,200 tons of naphtha as of December 17, surpassing the annual production target of 950,000 tons ahead of schedule [1] Group 1: Production Efficiency - The Yulin Refinery's Joint Workshop 3 focuses on process technology management to ensure efficient production [1] - The workshop emphasizes precise control of process indicators to prevent operational fluctuations and continuously optimizes operational parameters to maintain stable production processes [1] - A full-process inspection and closed-loop rectification mechanism has been established to address key tasks such as energy conservation and process technology transformation, achieving a 100% equipment integrity rate for the year [1] Group 2: Operational Excellence - Continuous strengthening of process discipline assessment and refinement of the indicator management system are in place to optimize operational conditions [1] - The overall goal is to ensure safe, stable, high-quality, and efficient operation of the facility [1]

榆炼提前完成年度石脑油生产任务 - Reportify