官宣!广州地铁二十二号线后通段12月29日开通运营
Nan Fang Du Shi Bao·2025-12-26 11:57

Core Points - Guangzhou Metro Line 22's southern extension (Chen Tou Gang to Fang Cun) will officially commence operations on December 29, increasing the total operational mileage of the Guangzhou Metro network to 779.9 kilometers and the number of stations to 397 [1] - The total length of Line 22 is 29.7 kilometers, designed for a speed of 160 kilometers per hour, with the southern extension measuring 11.5 kilometers and featuring four new stations: Nanpu West, Nanzhou, Xilang, and Fangcun [1] - The southern extension will connect with the initial segment of Line 22 (Panyu Square to Chen Tou Gang), utilizing 8-car D-type trains with a maximum capacity of 2,600 passengers, reducing travel time between Fangcun and Guangzhou South Station to 17 minutes [1] Infrastructure and Connectivity - Bus stops have been established at Nanpu West, Nanzhou, Xilang, and Fangcun stations to facilitate the "last mile" of passenger travel [2] - Guangzhou Metro is collaborating with local governments to enhance municipal infrastructure at Nanpu West Station, including road hardening, lighting, and guardrail projects, which are set to be completed and operational simultaneously [2]