3条新线今天开通!北京轨道交通驶入900公里大关
Bei Jing Ri Bao Ke Hu Duan·2025-12-27 00:54

Core Points - The opening of three new urban rail transit lines in Beijing marks a significant expansion of the city's transportation network, increasing the total operational mileage to 909 kilometers, enhancing service capacity and overall traffic capacity [1][2][5] Group 1: New Line Openings - The new lines include the middle section of Line 17 (Worker's Stadium to Shilihe), Line 18 (Malienwa to Tiantongyuan East), and the southern extension of Line 6 (Lucheng to Luyang), adding approximately 30 kilometers of operational track [1][2] - Line 17, a major north-south corridor, connects various residential and business districts, with the newly opened section spanning 8.2 kilometers and featuring four stations, including two transfer stations [2][5] - Line 18, serving as an east-west backbone for northern urban areas, covers about 19.8 kilometers with 11 stations, including four transfer stations, facilitating rapid commuting between key districts [7] Group 2: Transportation Efficiency - The full operation of Line 17 will reduce congestion on Lines 5 and 10, providing a faster commuting option for residents, with a total travel time of 66 minutes from south to north [5] - The new lines are expected to improve commuting efficiency and enhance connectivity between major residential areas and business hubs, thereby alleviating traffic congestion in the city [1][5] Group 3: Design and Amenities - The new stations are designed with a focus on aesthetics and functionality, featuring unique themes and cultural elements that reflect local heritage [15][17] - All new lines are equipped with modern amenities, including mother-baby rooms, accessible facilities, and emergency equipment, ensuring a user-friendly experience for all passengers [21][24] - The introduction of carbon fiber heated seats and ergonomic designs aims to enhance passenger comfort while promoting energy efficiency [26] Group 4: Integration with Public Transport - To facilitate seamless transfers between the new subway lines and bus services, adjustments to existing bus routes and the introduction of new lines have been implemented, enhancing overall travel efficiency [26] - The total number of bus routes serving the new lines has reached 121, with a focus on ensuring that bus stops are within 50 meters of subway stations for easy access [26] Group 5: Parking Facilities - New parking facilities have been constructed around the subway stations to accommodate both motor vehicles and non-motorized vehicles, providing ample parking spaces for commuters [28]