地铁6号线、宁马线通过项目工程验收
Nan Jing Ri Bao·2025-12-27 04:21

Core Viewpoint - The successful completion of project engineering acceptance for Nanjing Metro Line 6 and the Nanjing-Ma'anshan Railway (Ningma Line) marks a significant step towards their upcoming trial operation without passengers, laying a solid foundation for future operational launch [1][2] Group 1: Project Details - Nanjing Metro Line 6 spans approximately 32.35 kilometers, featuring 19 new stations, including 7 transfer stations, connecting key areas such as Xuanwu District, Qinhuai District, and the southern new city [1] - The Ningma Line extends about 54.23 kilometers with 16 stations, linking Nanjing's Xishanqiao Station to Ma'anshan's Taibai Station, enhancing the commuting network between the two cities [1][2] Group 2: Acceptance and Future Steps - The acceptance committee unanimously agreed that both metro lines have met construction tasks and quality standards, allowing them to proceed to the trial operation phase [2] - Following the acceptance, Nanjing Metro will simulate actual operating conditions to validate and optimize train operation parameters and system reliability, while continuing preparations for subsequent engineering and operational readiness [2] Group 3: Impact on Urban Transportation - The completion of these two lines will enhance the layout of Nanjing's rail transit network, improve urban transportation accessibility, and strengthen the metropolitan area's influence, contributing to the high-quality development of the Yangtze River Delta integration [2]